Admins can configure rules per contract type that require specific properties to be filled or parties to be verified before finalization is allowed. Rules are fully configurable: an project agreement might require project title and expiration date, while an MOU might require a purpose.

When a rule isn’t met, the finalize action is disabled and the blocking reasons are shown inline, so contract owners know exactly what needs to be resolved. Admins can override when needed, with every override logged in the contract timeline.